What is Kalamazoo Township doing to go solar?

Kalamazoo Charter Township and the Kalamazoo Area Building Authority (KABA) are committed to exceptional customer service related to solar permitting. Some key points regarding our commitment to solar energy:

  • Residential solar permit applications will receive a streamlined review. You can apply for a building permit online using the Citizen Self-Service portal. If you do not have access to a computer, use this one-page solar permit application for solar permits.
  • A zoning permit is only required for ground-mounted arrays. Use the Citizen Self-Service portal to apply for a zoning permit. Once you are in the system, click on the option for an accessory structure. A solar array is considered an accessory structure, and zone district setback standards for accessory structures must be followed. If you do not have access to the internet, you can use the paper zoning application.
  • A checklist has been provided to assist the customer. Find the checklist here.
  • Our staff is committed to a “less than three-business day” turnaround time for small rooftop solar PV permit applications.
  • We will offer an inspection appointment time for solar ( as opposed to an appointment window)
  • The inspection checklist is available here. This will assist the client with efficiently passing site inspections. Request a 10:00 AM or 2:00 PM appointment time for solar inspections.
  • Only one inspection is required for roof top solar projects. If ground mount solar has an in-ground post or footer, we require one inspection for the footer depth and then one other inspection for the final. We are committed to providing inspections within 48 hours of the request. Under normal conditions inspections typically occur within 24 hours of the request.

 